Basement Progress Report

I was really hoping to have a completed DRIcore subfloor to show you guys today, but alas we ran out of leveling shims and left off about 80% done. We are pretty proud of how much we got done though! We got our DRIcore delivery on Friday and El Granto unloaded all the subfloor & SMARTWALL panels into our dining room. Thank goodness for big tough husband muscles. I would have broken down and cried just looking at all that stuff to unload!

DRIcore subfloor and SMARTWALL unloaded into our dining room.
DRIcore subfloor and SMARTWALL unloaded into our dining room.

We did knock a few other things off the list since we last spoke (pretend we’re old friends having a lovely chat over tea and scones).

I tried some more wiring scenarios with the basement hall light, and have still come up short. I can only manage to get either the staircase OR the rest of the basement lights to work, not both. Womp womp.

I can only manage to have either the staircase light work OR the basement lights. Not both.
I can only manage to have either the staircase light work OR the basement lights. Not both.

Not to be deterred, I switched gears and set up some DIY scaffolding, which consisted of a leaning ladder and a 2×12.

Kristen's DIY "Scaffolding"
Kristen’s DIY “Scaffolding”

El Granto didn’t approve, but it actually felt quite sturdy to me! With the “scaffolding” in place I was able to reach most of the basement staircase ceiling (which happens to be the underside of the 2nd floor staircase). Now that we had access I could apply strapping to the staircase ceiling and prep for a new ceiling cladding.

After the strapping was up I could cut my V groove boards that I primed last week. A few cuts and out came the compressor and brad nailer. Most of the time my brad nailer and compressor do the job just fine, but when you’re standing 8 feet over the staircase putting up boards over your head and wrestling with the air cord, I really wish I’d splurged on a cordless brad nailer. This was especially so when my nailer kept misfiring and leaving nail-less holes in my board. Note to Santa, please bring Kristen a cordless brad nailer for Christmas, it will cut down on her volume of profanities exponentially. xox

Up went the first 8 boards and I was incredibly exited to see the transformation. The rest of the boards will have to hold off until I can fix the (insert string of expletives here) new staircase light. Then they need to be caulked, holes filled and painted.

Basement ceiling cladding going up
Basement ceiling cladding going up

Next up was tackling another one of my problem areas from last weekend: the new washer & dryer countertop. It was too tall to fit under the wall mounted lint trap. So out came the washer & dryer (again!) and we lowered the leveling feet, re-leveled them and re-taped the dryer vent and voila! The counter now fits. To get the counter to slide all the way back to the wall we broke out the jig saw and cut a notch for the dryer vent. The counter slid in perfectly, and we will now have no lost socks behind the dryer! Can I get a woot woot?

Next up on the task list was installing a little shelf over the washer & dryer to hold laundry detergent etc. Two Ikea black shelf bracket and a scrap piece of pine later as we had ourselves a shelf.

Washer & Dryer countertop and new shelf installed
Washer & Dryer countertop and new shelf installed

This week we would like to tackle painting the basement stairs, and this weekend finish off the DRIcore subfloor and start tackling the walls!

What project were you working on this weekend? How did it go?

Author: Kristen

Kristen & her husband El Granto & their Vizsla Odin live in a converted Storefront in downtown Toronto.

2 thoughts on “Basement Progress Report”

  1. nice work.

    (the link on the first line doesn’t work)

    I’ve been working on putting up the Ikea Kvartal track and ceiling fixtures(triple track, 3 across, 3 deep, through a drywall & some sorta metal window subframe). it’s about 50% done after 6 months!

    1. Thanks for the broken link tip Jim!

      Lighting and electrical is my nemesis! My mind just isn’t “wired” to understand electrical. 😉
      Good luck on your Kvartal. We may be in a race to see who gets it done first. I’m betting you win!